All odd conditions,
Pressure of timeline to finish job in time,
7 wire saws at one job, each one after another at every 3 meters, team of 23 people working at a time on all 7 machines,
Water flowing like river as every machine was working at full speed simultaneously
To cut metal by wire sawing. Legs were inside water for continuously 24 hours
Hats off to team ICFS who made it in time who worked for more than 36 hour continuously.
This is possible only because of determination, hard work, team work, dedication, mastery on job,and the team made it possible!!
Thanks and hats off again team ICFS
Keep it up!